Brighton High School

Cottonwood Heights, UT

The remodel for Brighton High School added incorporated new science rooms and computer labs to the existing building. A new building from the ground up, which was designed to house weight and dance rooms, was also added.

Hughes self-performed drainage, concrete, earthwork, and grading on the Brighton High School Track and Field Replacement project. After removing the grass, topsoil, and existing irrigation system, Hughes installed water lines, brought in structural fill, and put down a protective liner. The track overlay included an installed BSS- 200 polyurethane athletic track surface restoration with an embedded finish.